Services · Projects
Know what is really in the rack and the comms room.
Rack audits with photos, LED and alarm status, asset inventory to CSV, port maps, labelling fix-ups, spares checks and site surveys. Low-risk work that shows you how we report before you trust us with a change.
- Rack audits with photos
- Asset inventory to CSV
- Port maps and labelling
- Site surveys
PROOFBookable now
Sounds familiar
“The inventory says one thing and the rack says another.”
The CMDB and the rack disagree, and an audit or a move is coming.
Nobody has photos of the site, so every ticket starts with questions.
You are preparing for ISO 27001 or NIS2 and need clean asset records.
What’s included
Rack auditPhotos front and back, LED and alarm status, labelling and airflow observations.
Asset inventoryMake, model, serial, position and asset tag, delivered as CSV in your format.
Port mapsPorts traced and recorded, as-built drawings updated.
LabellingLabels fixed or added to your standard.
Spares checkSpares on site counted and checked against your list.
Site surveySpace, power, access and cabling paths surveyed before a deployment.
How the job runs
- 01Scope agreed: which racks, which fields, which format.
- 02Visit: data captured on a template, photos where allowed.
- 03Report within two business days, with observations ranked by risk.
What you get
- Audit report with photos
- Observations ranked by risk
- Inventory CSV and port map
What we need from you
- Access and permission to photograph
- Existing documentation, if any
How it’s priced
Audits are priced per rack, per device or per port, so you know the cost before we come. A site survey is a fixed price including the report.
Exact figures come with your written quote.
Best for
- New clients who want to see our reporting first
- Compliance preparation (ISO 27001, NIS2)
- Pre-move planning
Not included
| NOT INCLUDED | WHO DOES IT |
|---|---|
| Compliance opinions or certification | Your auditor |
| Electrical measurements | A licensed (SEP) electrician |
Questions
Why start with an audit?
It is low risk for you and shows exactly how we work and report. Most clients book one before the first production change.
Can you use our template?
Yes. Send the fields and format; we fill them in. Otherwise you get our CSV and report.
Related services
Lead serviceSmart and Remote HandsHands on your hardware: to your exact instructions, or with diagnosis.→Planned windowsMigrations and DecommissioningMoves planned in waves, and exits with every drive accounted for.→To your elevationRack and StackNew hardware installed, cabled and documented to your plan.→
Get a quote for this job
Describe the task, the site and the window. Written scope and price within four business hours.